1. project manager is the company's agent in the project, representing the company in full responsibility for the project, is the first person responsible for safety in production and quality of the project.
2., earnestly implement the company quality management system standards.
3. comply with the policies and regulations of the state and local governments, and implement the company's rules and regulations and instructions. In this project, on behalf of the company to perform the contract implementation of the relevant technical, engineering progress, on-site management, quality inspection, settlement and payment of work.
4., presided over the formulation of the project construction organization design, quality plan, the preparation of the annual, quarterly, monthly construction schedule.
5. go deep into the construction site to deal with the contradiction and solve the problem. Constantly improve the economic system, correctly handle the time limit, quality and effectiveness of the relationship.
6., do a good job in construction site management and spiritual civilization construction, care about the lives of workers, ensure safety in production, do a good job of fire protection, and protect the safety of workers, personal and property. In
accordance with the law, we should take part in important decisions concerning the interests of workers and staff members, safeguard the interests of workers and staff members, do well in the work of subsidies for difficulties, and convey their condolences to the sick, injured and disabled workers and staff members.
7., do a good job in the basic management of the project, to ensure that documents, data, data and information accurately and timely delivery and feedback, timely settlement of the project, liquidation.
8. complete other tasks assigned by the company.
Technical responsibilities
1., implement the relevant national technical policy and superior technical management system, be responsible for the technical work of the project.
2. organize construction technicians to study and implement various technical policies, technical regulations,
specifications, standards and technical management systems. Implement quality management system standards. Organize technical personnel familiar with the contract documents and construction drawings, construction drawings and participate in the investigation and design.
3., responsible for the formulation of construction plans, the preparation of construction technology, organizational design, and related technical personnel to make an explanation.
4. organize the planning and planning of the project, and assist the project manager in the daily management of the cost, safety, time limit and civilized construction of the project.
5. organize the quality inspection of the project department, supervise and inspect the production team to carry out self inspection, mutual inspection and handover inspection, and carry out quality engineering activities.
6. responsible for sorting out change design reports, claims, intentions reports and claims data.
7. participate in various construction, production and coordination meetings organized by the construction units, and compile the annual, quarterly and monthly construction progress plans.
8., responsible for the project at all stages of the project valuation, measurement data collection, collation and reporting, signing procedures.
9., responsible for the completion of technical documents, data preparation, to participate in the final acceptance.
Security Officer Responsibilities
1. under the leadership of the project manager, responsible for the supervision and inspection of the safety of the project.
2., implement the policy and policy of safety in production.
3., the implementation of the \"Regulations for the operation of safe production\" and other standards and standards.
4., regularly supervise and check technical operation procedures, implementation, and regulations, measures, disclosure requirements, the implementation of regular inspection, at any time to correct the risk of illegal operations. Ensure that all personnel entering the site must wear helmets and no slippers and high heels.
5. often go deep into the site to check the safety situation, find out the problem, put forward the improvement suggestion in time and report to the project manager and the builder.
6. responsible for compiling and reporting the statistics of safety production and labor protection.
7., responsible for the team security staff for business guidance, regular and irregular organization team study safety operation regulations, carry out safety education activities, and key types of day-to-day organization and management work.
8. fill in the safety account on time and do the accident analysis record and safety information management.
9. complete other tasks assigned by the leader.
Job responsibilities of construction staff
1. under the leadership of the project manager, responsible for
the on-site construction organization arrangements and construction management
2. responsible for field technical, measurement and test work.
3., to do on-site technical, safety and quality disclosure work, to fulfill the signing procedures, and regulations, measures, disclosure requirements, the implementation of regular inspection, at any time to correct illegal operations. Good technical guidance for construction team.
4. keep abreast of the operation methods of the operation team during the construction process, and strictly control the process.
5., according to the quality evaluation standards, check the construction quality of the operation team, do a good job of self inspection, mutual inspection and process handover inspection, and found that the unqualified products should be promptly corrected or reported to the project manager.
6. responsible for site preparation and protection of survey marks.
7. strict supervision and inspection and acceptance in the construction area, the materials and semi-finished products are qualified, stacking, loading and unloading, transport method is reasonable, to prevent damage and affect the quality of the project.
8. fill in all kinds of construction original records, hidden
engineering inspection records and engineering logs on time, and make sure that they are accurate.
9. accumulate raw material and provide change and claim basis.
The inspector responsibilities One
Under the leadership of the project leader and the construction leader, draw up the project quality plan and test work plan according to the construction organization design.
2. overall responsibility for project quality supervision and inspection.
3., responsible for inspection, identification and testing of engineering materials used in accordance with the specifications and design requirements.
4. check and guide the work of the test personnel.
5., do a good job of test reports and inspection records, to achieve accurate data, clear handwriting, neat and standardized, complete visa.
6. make a careful examination of the original records, the test reports and the information submitted by the supervising engineer and whether the test materials are complete, and submit them to the supervising engineer for signature procedures.
7. responsible for the identification and recording of the exception release. Be responsible for the identification of nonconforming products and follow up the verification of the setup.
8. to participate in sub item, sub project inspection, evaluation, according to the required time to submit project quality and other statistical statements.
9., strengthen contact with the resident supervision engineer, and do a good job of test and quality inspection work.
Material clerk responsibilities
1., under the leadership of the project manager, responsible for the management of project materials, and earnestly implement the quality standards.
2. master the name, specification, quantity and quality of the main materials needed. Cooperate with the construction department to prepare the construction material plan to ensure the material supply on the construction site.
3., good quality raw materials, finished products,
semi-finished products, components and parts of the incoming quality acceptance. Do a good job of stacking and keeping materials on site.
4.. Grasp the section and the situation of material consumption in each construction site, and provide the analysis information
to the project manager.
5. cooperate with construction materials to measure the staff responsible for work.
6., do a good job of internal and external settlement, the establishment of a variety of accounts, books clean and clear, accounting items consistent, profits and losses have reasons, damage reports, accounting vouchers, adjustments have basis.
7. responsible for all kinds of material vouchers, vouchers, accounting measurement certificate certificate of quality data collection, according to the degree of accurate and timely delivery and feedback, and bound into special custody.
8. dedicated, realistic, comprehensive, accurate and timely settlement, survey, statistics report.
9. complete other tasks assigned by the leader.
因篇幅问题不能全部显示,请点此查看更多更全内容